|
Teledyne LeCroy ZS4000: The Ultimate 4 GHz Active Probe for Precision Measurements |
$4,532.00 |
|
$4,532.00 |
|
|
Siglent SDS7304A H12: 4-Channel, 3 GHz, 500 Mpts, 20 GS/s, 12-bit Digital Oscilloscope |
$14,157.00 |
|
$14,157.00 |
|
|
Atk Marine Rebuilt Long Block Engines Dma1-Gtp |
$1,200.00 |
|
$1,200.00 |
|
|
Atk High Performance Gm 383 Stroker 500 Hp Stage 2 Long Block Crate Engines Hp55M |
$4,200.00 |
|
$4,200.00 |
|
|
CEP Portable 4-Wheel Power Distribution Cart for Generators — 480 Volts, 100 Amps, 3-Phase, Model# 6212PDC45 |
$5,809.00 |
|
$5,809.00 |
|
|
Blueprint Engines Gm 383 C.I.D. 436 Hp Dressed Stroker Long Block Crate Engines Bp38318Ctcv |
$3,600.00 |
|
$3,600.00 |
|
|
Atk High Performance Ford 347 Stroker 410 Hp Stage 2 Long Block Crate Engines Hp80M |
$3,600.00 |
|
$3,600.00 |
|
|
Blueprint Engines Gm 454 C.I.D. 460 Hp Cruiser Dressed Long Block Crate Engines Bp454Ctckb |
$5,400.00 |
|
$5,400.00 |
|
|
Teledyne LeCroy CP031A: High-Sensitivity AC/DC Current Probe for Precision Measurements |
$4,166.00 |
|
$4,166.00 |
|
|
Atk High Performance Gm 383 Stroker 435 Hp Stage 3 Long Block Crate Engines With Efi Hp36Cefi |
$4,200.00 |
|
$4,200.00 |
|
|
Cummins Commercial Standby Generator — 60kW, LP/NG, 277/480 Volts, 3-Phase, Model# RS60 |
$15,651.00 |
|
$15,651.00 |
|
|
Blueprint Engines Gm 350 C.I.D. 390 Hp Dressed Long Block Crate Engines Bp3505Ctc |
$2,400.00 |
|
$2,400.00 |
|
|
Ford Performance Parts D347Sr Long Block Spec Engine Kits M-9000-D347Srkit |
$4,200.00 |
|
$4,200.00 |
|
|
Chevrolet Performance 350 C.I.D. Base Long Block Crate Engines 19432780 |
$2,280.00 |
|
$2,280.00 |
|
|
Bird SH-60S-TC Handheld Spectrum Analyzer: Uncover RF Signals with Precision |
$6,551.00 |
|
$6,551.00 |
|
|
Instek GSP-9300BTG Spectrum Analyzer: Uncover Signal Insights with Precision and Versatility |
$2,526.00 |
|
$2,526.00 |
|
|
Additel ADT286 PS |
$880.00 |
|
$880.00 |
|
|
Atk High Performance Ford 302 300 Hp Stage 2 Long Block Crate Engines Hp06M |
$2,400.00 |
|
$2,400.00 |
|
|
Rosemount 2051CD |
$2,681.00 |
|
$2,681.00 |
|
|
Siglent ADP-18: Precision Differential TDR Probe for High-Speed Signal Analysis |
$880.00 |
|
$880.00 |
|
|
Furuno - 25kW 24RPM Radar Gearbox for FR8255 |
$4,230.00 |
|
$4,230.00 |
|
|
Fluke 190-204-III: 4-Channel, 200 MHz Handheld Oscilloscope for Precision Diagnostics |
$4,110.00 |
|
$4,110.00 |
|
|
Tektronix 6 Series B MSO: 8/64 Channel, 4 GHz, 12.5 GS/s Mixed Signal Oscilloscope |
$63,641.00 |
|
$63,641.00 |
|
|
DuroMax Portable Dual Fuel Generator — 10,000 Surge Watts, 8000 Rated Watts, Electric Start, CARB-Compliant, Model# XP10000EH |
$839.00 |
|
$839.00 |
|
|
Chevrolet Performance Sp350/357 Deluxe Crate Engines 19433033 |
$4,200.00 |
|
$4,200.00 |
|
|
Tektronix TBS1052C: 2-Channel Digital Oscilloscope with 50 MHz Bandwidth, 1 GS/s Sample Rate, and 20 kpts Memory |
$390.00 |
|
$390.00 |
|
|
Anritsu S362E-3431: The Ultimate Cable and Antenna Analyzer with Spectrum Analysis |
$2,059.00 |
|
$2,059.00 |
|
|
Furuno - NavPilot 711C-S with Octopus Pump 7ci to 12ci |
$2,010.00 |
|
$2,010.00 |
|
|
Yamaha, Portable Generator, Surge Watts 7200, Rated Watts 6000, Voltage 120/240, Model# EF72DEZ1 |
$1,539.00 |
|
$1,539.00 |
|
|
Teledyne LeCroy T3RC0600-HF: High-Frequency AC Current Probe for Precision Measurements |
$1,338.00 |
|
$1,338.00 |
|
|
Atk High Performance Ford 347 Stroker 450 Hp Stage 2 Long Block Crate Engines Hp100M |
$4,200.00 |
|
$4,200.00 |
|
|
Blueprint Engines Gm 350 C.I.D. 390 Hp Long Block Crate Engines Bp3505Ct |
$2,400.00 |
|
$2,400.00 |
|
|
Teledyne LeCroy AP033: Precision Differential Probe for High-Speed Signal Analysis |
$5,877.00 |
|
$5,877.00 |
|
|
Additel ADT286 TS |
$660.00 |
|
$660.00 |
|
|
Keysight DSOX4054A: 4-Channel, 500 MHz Digital Oscilloscope with 4 Mpts, 5 GS/s, and 12-bit Resolution |
$12,647.00 |
|
$12,647.00 |
|
|
Rohde & Schwarz FSC3.13 Spectrum Analyzer: Uncover Signal Insights from 9 kHz to 3 GHz |
$7,858.00 |
|
$7,858.00 |
|
|
PicoScope 2000 Series: 2207B MSO PC USB Oscilloscope with 70 MHz, 2/16 Channel MSO |
$584.00 |
|
$584.00 |
|
|
Blueprint Engines Pro Series Chevy 502 C.I.D. 621 Hp Dressed Long Block Crate Engines Ps502Ctckb |
$7,200.00 |
|
$7,200.00 |
|
|
Blueprint Engines Chevy Ls 376 C.I.D. 530Hp Efi Retrofit Dressed Long Block Crate Engines Psls3760Ctf |
$4,800.00 |
|
$4,800.00 |
|
|
B&G - Vulcan 9 Radar Bundle - With HALO20 Radar |
$1,760.00 |
|
$1,760.00 |
|
|
Teledyne LeCroy T3DSOH1102: Compact and Powerful Handheld Oscilloscope for Precision Measurements |
$1,429.00 |
|
$1,429.00 |
|
|
Keysight N2780B: Precision Current Probe for AC/DC Measurements |
$5,536.00 |
|
$5,536.00 |
|
|
Teledyne LeCroy T3LCR1100: High-Precision LCR Meter for Accurate Component Analysis |
$2,055.00 |
|
$2,055.00 |
|
|
Tektronix RSA518A: Portable Spectrum Analyzer for Precision Signal Analysis (9 kHz - 18 GHz) |
$20,716.00 |
|
$20,716.00 |
|
|
Furuno - 165T/275LHW Pocket Mount Combo Wide Beam Transducer f/DFF3D |
$2,330.00 |
|
$4,660.00 |
|
|
Tektronix TIVP1L: High-Voltage Differential Probe for Precision Measurements |
$22,664.00 |
|
$22,664.00 |
|
|
Additel AM1730 12 SP |
$440.00 |
|
$440.00 |
|
|
DuroMax Portable Dual Fuel Generator — 13,000 Surge Watts, 10,500 Rated Watts, Electric Start, CARB Compliant, Model# XP13000EH |
$1,049.00 |
|
$1,049.00 |
|
|
Tektronix TCP404XL Current Probe: Precision Measurement for AC/DC Currents |
$4,273.00 |
|
$4,273.00 |
|
|
Atk Marine Rebuilt Long Block Engines Vmb3 |
$1,200.00 |
|
$1,200.00 |
|
|
Flir T560 42 Est |
$4,292.00 |
|
$4,292.00 |
|
|
Flir T840 14 |
$6,009.00 |
|
$6,009.00 |
|
|
Emerson TREXLFPKL9P3 |
$6,536.00 |
|
$6,536.00 |
|
|
Instek LCR-6100: Precision LCR Meter for Accurate Component Analysis |
$1,137.00 |
|
$1,137.00 |
|
|
Emerson TREXCFPKLWS1 |
$4,768.00 |
|
$4,768.00 |
|
|
Tektronix RSA607A/04: Real-Time Spectrum Analyzer with Tracking Generator (9kHz - 7.5GHz) |
$13,897.00 |
|
$13,897.00 |
|
|
Ametek Jofra DTI050GXX |
$520.00 |
|
$520.00 |
|
|
Dwyer Instruments PUF-1001 |
$4,211.00 |
|
$4,211.00 |
|
|
FLIR E6 WIFI |
$670.00 |
|
$670.00 |
|
|
Furuno - NavNet TZtouch2 Black Box Chartplotter/Fishfinder |
$3,460.00 |
|
$3,460.00 |
|
|
Blueprint Engines Crate Engines Bp302Rctcd |
$3,600.00 |
|
$3,600.00 |
|
|
Pico Technology 6804E-D4: 500MHz, 8-Channel, 8-Bit, 2GS PC USB Oscilloscope |
$7,598.00 |
|
$7,598.00 |
|
|
Furuno - 1623 LCD Radar |
$940.00 |
|
$940.00 |
|
|
Furuno - NavNet TZtouch3 9" Hybrid Control MFD with Single Channel CHIRP Sonar |
$1,570.00 |
|
$1,570.00 |
|
|
Furuno - Thru-Hull Multibeam Transducer f/DDF3D |
$1,190.00 |
|
$1,190.00 |
|
|
Blueprint Engines 350 C.I.D. Cruiser Fully Dressed Crate Engines Bp350Ctck |
$3,600.00 |
|
$3,600.00 |
|
|
2024 Yamaha Grizzly 90 for Sale |
$2,200.00 |
|
$2,200.00 |
|
|
RIGOL MSO5074: 70 MHz, 8 GS/s, 100 Mpts Mixed Signal Oscilloscope with 4/16 Channels |
$649.00 |
|
$649.00 |
|
|
EMAX 20 Gallon 14HP Kohler Engine Gasoline Powered Air Compressor |
$1,891.00 |
|
$1,891.00 |
|
|
Teledyne LeCroy T3DSO3204 PROMO1: 4/16-Channel MSO Oscilloscope with 200 MHz Bandwidth, 5 GS/s Sample Rate, and 250 Mpts Memory |
$3,591.00 |
|
$3,591.00 |
|
|
Blueprint Engines Crate Engines Bp302Rctc |
$3,000.00 |
|
$3,000.00 |
|
|
Blueprint Engines Gm 454 C.I.D. 460 Hp Cruiser Dressed Long Block Crate Engines With Fuel Injection Bp454Ctfk |
$6,000.00 |
|
$6,000.00 |
|
|
Teledyne LeCroy CP030-Precision Current Probe for AC/DC Measurements |
$2,665.00 |
|
$2,665.00 |
|
|
Keysight N2750A InfiniiMode: The Ultimate Differential Probe for Precision Measurements |
$3,266.00 |
|
$3,266.00 |
|
|
Teledyne LeCroy T3DSO3354 PROMO1: 4/16-Channel, 350 MHz, 5 GS/s, 250 Mpts MSO Oscilloscope |
$5,117.00 |
|
$5,117.00 |
|
|
RIGOL MSO8154A: Unleash the Power of Mixed Signal Analysis with 1.5 GHz Bandwidth and 10 GS/s Sample Rate |
$7,143.00 |
|
$7,143.00 |
|
|
Flir T640 Nist 25 |
$9,283.00 |
|
$9,283.00 |
|
|
Blueprint Engines Ford 347 C.I.D. 415 Hp Base Stroker Long Block Crate Engines Bp3474Ct |
$3,600.00 |
|
$3,600.00 |
|
|
Fluke 1524 P4 156 |
$1,400.00 |
|
$1,400.00 |
|
|
PicoScope 3000 Series: 3405D MSO PC USB Oscilloscope with 100 MHz, 4/16 Channel MSO |
$1,364.00 |
|
$1,364.00 |
|
|
Keysight E4416A RF Power Meter: Precision Power Measurement with Front Sensor and High Sampling Rate |
$5,390.00 |
|
$5,390.00 |
|
|
Flir T560 24 + 14 + 42 |
$6,799.00 |
|
$6,799.00 |
|
|
Tektronix 5 Series B MSO: 6/48 Channel, 500MHz, 6.25 GS/s Mixed Signal Oscilloscope |
$20,002.00 |
|
$20,002.00 |
|
|
Siglent DPB5700A: High-Voltage Differential Probe for Precision Measurements |
$1,513.00 |
|
$1,513.00 |
|
|
Tektronix TDP1500: 1.5 GHz Differential Probe for Precision Measurements |
$4,383.00 |
|
$4,383.00 |
|
|
Teledyne LeCroy T3DSO2354HD: 4-Channel, 350MHz Digital Oscilloscope with 2 GS/s and 200 Mpts |
$3,695.00 |
|
$3,695.00 |
|
|
Tektronix P7720 TriMode Probe: 20 GHz Precision for TekConnect Interfaces |
$22,794.00 |
|
$22,794.00 |
|
|
AccuMac AM1762 12 |
$410.00 |
|
$410.00 |
|
|
Cub Cadet PRO Z 100 S Series EFI Lawn Mower 60in 747cc 27HP |
$5,340.00 |
|
$5,340.00 |
|
|
Keysight N2804A: High-Voltage Differential Probe for Precision Measurements |
$2,442.00 |
|
$2,442.00 |
|
Back To Shop
|