Product Price Quantity Total  
Additel AM1730 12 SP Additel AM1730 12 SP $440.00
$440.00
Chroma 62050P-100-100 DC Power Supply, Single Output, 100 V, 100 A, 5000 W, 62000P Series Chroma 62050P-100-100 DC Power Supply, Single Output, 100 V, 100 A, 5000 W, 62000P Series $5,805.00
$5,805.00
Furuno - Thru-Hull Multibeam Transducer f/DDF3D Furuno - Thru-Hull Multibeam Transducer f/DDF3D $1,190.00
$1,190.00
Cub Cadet PRO Z 500 S Series Lawn Mower 60in 852cc 27HP Cub Cadet PRO Z 500 S Series Lawn Mower 60in 852cc 27HP $7,980.00
$7,980.00
Dwyer Instruments DR224132M Dwyer Instruments DR224132M $197.00
$197.00
Siglent SSG5060X-V: Unleash Precision RF Signal Generation from 9kHz to 6GHz Siglent SSG5060X-V: Unleash Precision RF Signal Generation from 9kHz to 6GHz $10,245.00
$20,490.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$2,681.00
B&K Precision 8514B Programmable DC Electronic Load, 240A, 120V, 1.5kW, 8500B Series B&K Precision 8514B Programmable DC Electronic Load, 240A, 120V, 1.5kW, 8500B Series $2,389.00
$2,389.00
Furuno - 165T-50/200-SS260 DFF3D - Thru-Hull Combo Transducer Furuno - 165T-50/200-SS260 DFF3D - Thru-Hull Combo Transducer $1,890.00
$1,890.00
Chevrolet Performance Sp350/357 Deluxe Crate Engines 19433033 Chevrolet Performance Sp350/357 Deluxe Crate Engines 19433033 $4,200.00
$4,200.00
Dwyer Instruments DR224182M Dwyer Instruments DR224182M $197.00
$197.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$5,362.00
Atk Marine Rebuilt Long Block Engines Vmh4 Atk Marine Rebuilt Long Block Engines Vmh4 $1,200.00
$1,200.00
EA Elektro-Automatik EA-PS 10500-30 3U DC Power Supply, Autoranging, Rackmount, Single Output, 500VDC, 30ADC EA Elektro-Automatik EA-PS 10500-30 3U DC Power Supply, Autoranging, Rackmount, Single Output, 500VDC, 30ADC $3,702.00
$3,702.00
Cub Cadet Ultima Series ZTS1 Zero Turn Lawn Mower 42in 22HP Cub Cadet Ultima Series ZTS1 Zero Turn Lawn Mower 42in 22HP $2,800.00
$2,800.00
Rosemount 2051CD Rosemount 2051CD $2,870.00
$2,870.00
Keysight MXR608B Keysight MXR208B Infiniium: 8-Channel, 2 GHz, 16 GS/s Real-Time Oscilloscope for Precision Analysis $45,159.00
$45,159.00
2025 Honda FourTrax Rancher 4×4 Automatic DCT EPS for Sale 2025 Honda FourTrax Rancher 4×4 Automatic DCT EPS for Sale $6,777.00
$13,554.00
EA Elektro-Automatik EA-PS 10200-140 3U DC Power Supply, Autoranging, Single Output, 200 VDC, 140 ADC EA Elektro-Automatik EA-PS 10200-140 3U DC Power Supply, Autoranging, Single Output, 200 VDC, 140 ADC $5,455.00
$5,455.00
Keysight L2055XA: Unparalleled Power Measurement with Wide Dynamic Range and Frequency Coverage Keysight L2055XA: Unparalleled Power Measurement with Wide Dynamic Range and Frequency Coverage $12,923.00
$12,923.00
Keysight N5395C Ethernet Test Fixtures: Enhance Compliance Testing for 10/100/1G Applications Keysight N5395C Ethernet Test Fixtures: Enhance Compliance Testing for 10/100/1G Applications $2,308.00
$2,308.00
Keysight L2066XT/100/U2037A: Precision Thermal Vacuum Power Measurement from 10MHz to 54GHz Keysight L2066XT/100/U2037A: Precision Thermal Vacuum Power Measurement from 10MHz to 54GHz $21,041.00
$21,041.00
Instek Instek MPO-2104B: 4-Channel, 100MHz DSO with SA, AWG, DMM, and Power Supply $1,299.00
$1,299.00
Fluke Networks DSX2-8000MI/GLD: 2GHz Dsx Multimode OLTS Inspection V2 with Wi-Fi Fluke Networks DSX2-8000MI/GLD: 2GHz Dsx Multimode OLTS Inspection V2 with Wi-Fi $15,565.00
$15,565.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$2,681.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$2,681.00
Teledyne LeCroy T3RC3000-LF Teledyne LeCroy T3RC3000-LF: High-Precision AC Current Probe for Demanding Applications $1,273.00
$1,273.00
Keysight N7973A Adv Power System, DC Power Supply, 60V, 33A, 2kW, N7900 Series Keysight N7973A Adv Power System, DC Power Supply, 60V, 33A, 2kW, N7900 Series $11,949.00
$11,949.00
Keysight 8478B/100: Coaxial Thermistor Mount for Precise Temperature Measurements Keysight 8478B/100: Coaxial Thermistor Mount for Precise Temperature Measurements $10,802.00
$10,802.00
Flir T560 42 Flir T560 42 $6,943.00
$6,943.00
Chevrolet Performance 3.8L 231 C.I.D. Remanufactured Long Block Crate Engines 19168948 Chevrolet Performance 3.8L 231 C.I.D. Remanufactured Long Block Crate Engines 19168948 $1,200.00
$1,200.00
2024 Yamaha Grizzly 90 for Sale 2024 Yamaha Grizzly 90 for Sale $2,200.00
$8,800.00
Hioki 3506-10 Capacitance Meter: Precision Measurement with Low Noise and BIN Function Hioki 3506-10 Capacitance Meter: Precision Measurement with Low Noise and BIN Function $3,388.00
$3,388.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$2,681.00
Panametrics XMO2 Panametrics XMO2 $3,167.00
$3,167.00
Furuno - B275LHW Bronze Thru-Hull CHIRP Transducer - 12-Pin Furuno - B275LHW Bronze Thru-Hull CHIRP Transducer - 12-Pin $1,320.00
$2,640.00
EA Elektro-Automatik EA-PSI 9040-20 T DC Power Supply, Benchtop Tower, 100-240, 40 V, 20 A, 320W SLV EA Elektro-Automatik EA-PSI 9040-20 T DC Power Supply, Benchtop Tower, 100-240, 40 V, 20 A, 320W SLV $1,039.00
$1,039.00
Keysight 16334A Tweezer Contacts Test Fixture: Precision Impedance Testing for Tiny SMDs Keysight 16334A Tweezer Contacts Test Fixture: Precision Impedance Testing for Tiny SMDs $1,042.00
$2,084.00
Cub Cadet Ultima Series ZT2 Lawn Mower 60in 726cc 24HP Cub Cadet Ultima Series ZT2 Lawn Mower 60in 726cc 24HP $3,060.00
$3,060.00
2025 CFMOTO CForce 600 Touring for Sale 2025 CFMOTO CForce 600 Touring for Sale $5,001.00
$10,002.00
Anritsu Anritsu Field Master Pro MS2090A/0754: Unparalleled Spectrum Analysis from 9 kHz to 54 GHz $47,664.00
$47,664.00
Atk High Performance Ford 347 Stroker 410 Hp Stage 2 Long Block Crate Engines Hp80M Atk High Performance Ford 347 Stroker 410 Hp Stage 2 Long Block Crate Engines Hp80M $3,600.00
$3,600.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$2,681.00
Fluke Networks MS-POE-IE: Essential Cable Verifier for Ethernet, PoE, and 10G Networks Fluke Networks MS-POE-IE: Essential Cable Verifier for Ethernet, PoE, and 10G Networks $1,151.00
$1,151.00
B&G - Zeus3 7" MFD Display - With Insight Charts B&G - Zeus3 7" MFD Display - With Insight Charts $881.00
$881.00
Dwyer Instruments PDWS-1Y Dwyer Instruments PDWS-1Y $239.00
$239.00
Dwyer Instruments PUF-1001 Dwyer Instruments PUF-1001 $6,385.00
$6,385.00
Dwyer Instruments RSF125V Dwyer Instruments RSF125V $416.00
$416.00
Instek Instek GSP-8800: 8.8 GHz Benchtop Spectrum Analyzer for Precision Analysis $4,026.00
$4,026.00
Dwyer Instruments DMF-41404 Dwyer Instruments DMF-41404 $1,307.00
$1,307.00
Atk High Performance Gm 383 Stroker 415 Hp Stage 3 Long Block Crate Engines Hp94C Atk High Performance Gm 383 Stroker 415 Hp Stage 3 Long Block Crate Engines Hp94C $3,600.00
$3,600.00
Fluke Networks DSX2-8000-PRO/GLD: The Ultimate 2GHz Pro Kit for Network Testing Fluke Networks DSX2-8000-PRO/GLD: The Ultimate 2GHz Pro Kit for Network Testing $49,538.00
$49,538.00
RIGOL DSG5128: 8-Channel RF Signal Generator for Precision Testing (9 kHz - 12 GHz) RIGOL DSG5128: 8-Channel RF Signal Generator for Precision Testing (9 kHz - 12 GHz) $113,478.00
$113,478.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$2,681.00
AccuMac 8060 AccuMac 8060 $620.00
$620.00
Rosemount 2051CD Rosemount 2051CD $2,681.00
$2,681.00
Keysight 16048G/ABA Extension Cable: Extend Your Impedance Analyzer's Reach Keysight 16048G/ABA Extension Cable: Extend Your Impedance Analyzer's Reach $1,726.00
$1,726.00
Dwyer Instruments DR224432 Dwyer Instruments DR224432 $197.00
$197.00
Keysight 16200B External DC Bias Adapter: Enhance Signal Integrity with Precision Bias Control Keysight 16200B External DC Bias Adapter: Enhance Signal Integrity with Precision Bias Control $6,520.00
$6,520.00
Atk Marine Rebuilt Long Block Engines Vmm6 Atk Marine Rebuilt Long Block Engines Vmm6 $1,200.00
$1,200.00
Keysight N5746A/903 DC System Power Supply, Single Output, 40 V, 19 A, 760 W, N5700 Series Keysight N5746A/903 DC System Power Supply, Single Output, 40 V, 19 A, 760 W, N5700 Series $2,338.00
$2,338.00
Tektronix Tektronix 6 Series B MSO: 6 GHz, 25 GS/s, 4/32 Channel Mixed Signal Oscilloscope $53,900.00
$53,900.00
Dwyer Instruments IF2719 Dwyer Instruments IF2719 $725.00
$725.00
Teledyne LeCroy CP030 Teledyne LeCroy CP030-Precision Current Probe for AC/DC Measurements $2,665.00
$2,665.00
Keysight 16048G Extension Cable: Extend Your Impedance Analyzer's Reach Keysight 16048G Extension Cable: Extend Your Impedance Analyzer's Reach $1,719.00
$1,719.00
Keysight Keysight EXR108A: 8-Channel, 1 GHz, 100 Mpts, 16 GS/s, 10-bit Mixed Signal Oscilloscope $33,184.00
$33,184.00
Teledyne Teledyne LeCroy WAVESURFER 3054Z: 4-Channel, 500 MHz, 4 GS/s Digital Oscilloscope with 10 Mpts Memory $7,533.00
$7,533.00
Keysight 16192A/701/710: Precision SMD Test Fixture with Enhanced Inspection Tools Keysight 16192A/701/710: Precision SMD Test Fixture with Enhanced Inspection Tools $4,328.00
$4,328.00
Dwyer Instruments DMF-41405 Dwyer Instruments DMF-41405 $1,307.00
$1,307.00
GaGe CSE4427 GaGe CSE4427 CompuScope: 2-Channel, 16-Bit, 100MS/s, 2GS PCIe Oscilloscope $4,416.00
$4,416.00
Dwyer Instruments UXF2-22P1 Dwyer Instruments UXF2-22P1 $1,098.00
$1,098.00
Furuno - M260 In-Hull 1kW Transducer with No Connector Furuno - M260 In-Hull 1kW Transducer with No Connector $630.00
$630.00
Dwyer Instruments GFM-2111 Dwyer Instruments GFM-2111 $952.00
$952.00
Fluke Fluke 190-202-III-S: 200 MHz Handheld Oscilloscope with SCC-293 Kit for Precision Diagnostics $3,727.00
$3,727.00
Atk Marine Rebuilt Long Block Engines Vmk9 Atk Marine Rebuilt Long Block Engines Vmk9 $1,800.00
$3,600.00
Keysight 16047E Axial Lead Component Test Fixture: Precision Testing at 120 MHz Keysight 16047E Axial Lead Component Test Fixture: Precision Testing at 120 MHz $1,662.00
$1,662.00
Keysight N5171B/501 EXG X-Series RF Analog Signal Generator: Unleash Precision Signal Generation from 9 kHz to 1 GHz Keysight N5171B/501 EXG X-Series RF Analog Signal Generator: Unleash Precision Signal Generation from 9 kHz to 1 GHz $7,068.00
$7,068.00
Keysight U1731P Handheld LCR Meter Combo Kit: Precision Measurement at Your Fingertips Keysight U1731P Handheld LCR Meter Combo Kit: Precision Measurement at Your Fingertips $390.00
$390.00
Fluke TIS60+ 30HZ TIS60+ 30HZ $1,432.00
$1,432.00
EGO 24 in Self-Propelled 2-Stage XP Snow Blower with Peak Power Kit EGO 24 in Self-Propelled 2-Stage XP Snow Blower with Peak Power Kit $1,010.00
$1,010.00
LUCID LS6084B: Unleash the Power of 6GHz Signal Generation with Four Channels LUCID LS6084B: Unleash the Power of 6GHz Signal Generation with Four Channels $25,905.00
$25,905.00
Blueprint Engines Gm 350 C.I.D. 390 Hp Dressed Long Block Crate Engines Bp3505Ctc Blueprint Engines Gm 350 C.I.D. 390 Hp Dressed Long Block Crate Engines Bp3505Ctc $2,400.00
$2,400.00
Keysight 16065A External Bias Fixture: Enhance Device Characterization with Precision and Flexibility Keysight 16065A External Bias Fixture: Enhance Device Characterization with Precision and Flexibility $1,892.00
$1,892.00
Blueprint Engines Gm 400 C.I.D. 508 Hp Dressed Long Block Crate Engines Bp4002Ctc1D Blueprint Engines Gm 400 C.I.D. 508 Hp Dressed Long Block Crate Engines Bp4002Ctc1D $4,200.00
$4,200.00
Furuno - FCV 295 10.4" Fishfinder Furuno - FCV 295 10.4" Fishfinder $2,000.00
$2,000.00
Furuno - 165T-SS54 Stainless Steel Thru-Hull Transducer for DFF3D Sounder Furuno - 165T-SS54 Stainless Steel Thru-Hull Transducer for DFF3D Sounder $1,190.00
$1,190.00
Pico Technology PG914: Unleash Precision with the 1 GHz, 4-Channel Pulse Generator Pico Technology PG914: Unleash Precision with the 1 GHz, 4-Channel Pulse Generator $9,118.00
$9,118.00
Instek LCR-15A: Precision SMD/Chip Test Fixture for LCR-6000/8200 Series Instek LCR-15A: Precision SMD/Chip Test Fixture for LCR-6000/8200 Series $799.00
$799.00
Chroma 19301A Impulse Winding Tester: Precision Inductance Measurement for High-Voltage Applications Chroma 19301A Impulse Winding Tester: Precision Inductance Measurement for High-Voltage Applications $17,322.00
$17,322.00
Siglent CP6030 Current Probes: Precision Measurement for Electrical Systems Siglent CP6030 Current Probes: Precision Measurement for Electrical Systems $1,484.00
$1,484.00
Keysight 16454A: The Ultimate Magnetic Material Test Fixture for Precision Measurements Keysight 16454A: The Ultimate Magnetic Material Test Fixture for Precision Measurements $6,903.00
$6,903.00
B&G - Vulcan 9 Radar Bundle - With HALO20 Radar B&G - Vulcan 9 Radar Bundle - With HALO20 Radar $1,760.00
$1,760.00
Dwyer Instruments UFB-222 Dwyer Instruments UFB-222 $1,773.00
$1,773.00
Keysight Keysight EXR258A: 8-Channel, 2.5 GHz Mixed Signal Oscilloscope with 100 Mpts, 16 GS/s, and 10-bit Resolution $46,497.00
$46,497.00
Keysight N7977A Adv Power System, DC Power Supply, 160V, 12.5A, 2kW, N7900 Series Keysight N7977A Adv Power System, DC Power Supply, 160V, 12.5A, 2kW, N7900 Series $11,949.00
$11,949.00
Keysight N9000B/513 Keysight N9000B/513 CXA Signal Analyzer: Uncover Signal Insights with Precision up to 13 GHz $23,703.00
$23,703.00
Teledyne Teledyne LeCroy WAVESURFER 3054Z PROMO1: 4-Channel, 500 MHz, 4 GS/s MSO Oscilloscope $5,487.00
$5,487.00
Dwyer Instruments IF2711 Dwyer Instruments IF2711 $394.00
$394.00
Dwyer Instruments PME-33 Dwyer Instruments PME-33 $604.00
$604.00
Bird 4027A100M Power Sensor: Measure Power Accurately from 95-105 MHz Bird 4027A100M Power Sensor: Measure Power Accurately from 95-105 MHz $2,319.00
$2,319.00
Unleash Precision: Instek ASR-3300 3k VA Programmable AC/DC Source Unleash Precision: Instek ASR-3300 3k VA Programmable AC/DC Source $5,520.00
$5,520.00
Dwyer Instruments GFM-1131 Dwyer Instruments GFM-1131 $700.00
$700.00
Chevrolet Performance Ls 376/515 Ls3 Long Block Crate Engines 19370412 Chevrolet Performance Ls 376/515 Ls3 Long Block Crate Engines 19370412 $4,800.00
$4,800.00
Keysight Keysight KEU N9030B: Unparalleled Signal Analysis from 2 Hz to 50 GHz $61,693.00
$61,693.00
Emerson TREXLHPNAWS1 Emerson TREXLHPNAWS1 $3,846.00
$3,846.00
Teledyne LeCroy T3LCR1100: High-Precision LCR Meter for Accurate Component Analysis Teledyne LeCroy T3LCR1100: High-Precision LCR Meter for Accurate Component Analysis $2,055.00
$2,055.00
TekBox TBMDA-CDN25: 25W Modulated Wideband Power Amplifier for 100 kHz - 250 MHz TekBox TBMDA-CDN25: 25W Modulated Wideband Power Amplifier for 100 kHz - 250 MHz $1,747.00
$1,747.00
Furuno - Multi-Beam Sonar - For NavNet TZtouch, TZtouch4 Furuno - Multi-Beam Sonar - For NavNet TZtouch, TZtouch4 $1,250.00
$1,250.00
Generac Generac Smart Switch Automatic Generator Transfer Switch — 400 Amps, 120/240 Volts, Single Phase, Model# RTSR400A3 $1,413.00
$1,413.00
Teledyne LeCroy T3DSO1302A Teledyne LeCroy T3DSO1302A: 2-Channel Digital Oscilloscope with 350 MHz Bandwidth, 2 GS/s Sample Rate, and 14 Mpts Memory $974.00
$974.00
Atk High Performance Chevy 383 Stroker 470 Hp Base Long Block Crate Engines Hp101 Atk High Performance Chevy 383 Stroker 470 Hp Base Long Block Crate Engines Hp101 $3,000.00
$3,000.00
Keysight N7015A: High-Speed Type-C Test Fixture for Infiniium Scopes Keysight N7015A: High-Speed Type-C Test Fixture for Infiniium Scopes $9,908.00
$9,908.00
Back To Shop

Cart totals

Subtotal $903,967.00

Shipping

Shipping options will be updated during checkout.

Total $903,967.00

Main Menu