-
2 × $2,403.00
-
2 × $2,300.00
-
1 × $4,351.00
-
1 × $3,600.00
-
2 × $545.00
-
1 × $5,864.00
-
1 × $1,080.00
-
1 × $3,060.00
-
2 × $500.00
-
1 × $3,023.00
-
1 × $2,300.00
-
1 × $5,677.00
-
1 × $28,184.00
-
1 × $5,580.00
-
1 × $2,390.00
-
1 × $3,900.00
-
Keysight N5171B EXG X-Series Signal Generator: Unleash Precision and Versatility from 9 kHz to 3 GHz1 × $9,986.00
-
2 × $4,351.00
-
1 × $2,850.00
-
1 × $111,697.00
-
1 × $1,703.00
-
1 × $594.00
-
1 × $1,234.00
-
1 × $660.00
-
1 × $3,846.00
-
1 × $40,912.00
-
Chroma 19301A Impulse Winding Tester: Precision Inductance Measurement for High-Voltage Applications1 × $17,322.00
-
2 × $2,681.00
-
1 × $19,807.00
-
1 × $2,874.00
-
1 × $52,994.00
-
1 × $13,014.00
-
1 × $676.00
-
EA Elektro-Automatik EA-PS 11000-10 2U DC Power Supply, Autoranging, Single Output, 1000 VDC, 10 ADC1 × $4,351.00
-
1 × $1,413.00
-
1 × $2,001.00
-
1 × $689.00
-
1 × $2,630.00
-
1 × $1,321.00
-
1 × $1,190.00
-
1 × $71,009.00
-
1 × $6,039.00
-
1 × $4,416.00
-
1 × $2,551.00
-
1 × $197.00
-
1 × $1,800.00
-
1 × $27,145.00
-
1 × $2,308.00
-
1 × $2,200.00
-
1 × $2,270.00
-
1 × $7,874.00
-
1 × $552.00
-
1 × $511.00
-
Keysight N2804A: High-Voltage Differential Probe for Precision Measurements
Keysight N2804A High-Voltage Differential Probe: 300 MHz bandwidth, 100:1 attenuation, 4M ohm/4 pF input impedance, 30cm leads, high-voltage measurement, differential probe, Keysight Technologies.
$2,442.00