-
1 × $146,764.00
-
2 × $17,859.00
-
2 × $56,498.00
-
1 × $5,130.00
-
1 × $4,730.00
-
1 × $5,945.00
-
1 × $45,159.00
-
1 × $8,702.00
-
1 × $1,790.00
-
1 × $1,338.00
-
1 × $2,564.00
-
1 × $5,241.00
-
1 × $689.00
-
1 × $5,117.00
-
1 × $1,533.00
-
1 × $40,912.00
-
1 × $704.00
-
1 × $1,570.00
-
1 × $9,150.00
-
1 × $3,390.00
-
1 × $1,307.00
-
1 × $5,130.00
-
1 × $3,702.00
-
2 × $18,731.00
-
1 × $1,751.00
-
EA Elektro-Automatik EA-PSI 9040-20 T DC Power Supply, Benchtop Tower, 100-240, 40 V, 20 A, 320W SLV1 × $1,039.00
-
1 × $3,318.00
-
2 × $9,204.00
-
1 × $206.00
-
1 × $6,169.00
-
1 × $1,098.00
-
1 × $14,306.00
-
2 × $10,715.00
-
1 × $85,630.00
-
1 × $3,845.00
-
1 × $28,572.00
-
1 × $3,031.00
-
1 × $2,010.00
-
1 × $243.00
-
1 × $14,269.00
-
1 × $47,556.00
-
1 × $7,078.00
-
1 × $1,131.00
-
1 × $1,338.00
-
1 × $13,743.00
-
1 × $7,095.00
-
1 × $14,506.00
-
1 × $15,379.00
-
1 × $1,307.00
-
1 × $1,307.00
-
2 × $810.00
-
1 × $1,760.00
-
1 × $9,157.00
-
1 × $3,240.00
-
1 × $3,188.00
-
1 × $1,220.00
-
1 × $8,501.00
-
1 × $2,308.00
-
2 × $3,831.00
-
1 × $440.00
-
1 × $12,793.00
-
1 × $3,685.00
-
1 × $6,136.00
-
1 × $13,169.00
-
1 × $9,214.00
-
1 × $1,206.00
-
1 × $22,261.00
-
1 × $10,715.00
-
1 × $3,388.00
-
1 × $21,041.00
-
1 × $2,681.00
-
1 × $12,081.00
-
1 × $4,200.00
-
1 × $38,185.00
-
1 × $3,695.00
-
1 × $2,681.00
-
1 × $6,000.00
-
1 × $2,468.00
-
1 × $16,677.00
-
1 × $4,567.00
-
1 × $1,760.00
-
1 × $3,600.00
-
1 × $1,659.00
-
1 × $5,910.00
-
1 × $2,010.00
-
Keysight E4416A RF Power Meter: Precision Power Measurement with Front Sensor and High Sampling Rate1 × $5,390.00
-
1 × $11,429.00
-
1 × $1,250.00
-
Keysight N2804A: High-Voltage Differential Probe for Precision Measurements
Keysight N2804A High-Voltage Differential Probe: 300 MHz bandwidth, 100:1 attenuation, 4M ohm/4 pF input impedance, 30cm leads, high-voltage measurement, differential probe, Keysight Technologies.
$2,442.00